This topic contains 1 reply, has 2 voices, and was last updated by retage 1 month, 1 week ago.
Viewing 2 posts - 1 through 2 (of 2 total)
Viewing 2 posts - 1 through 2 (of 2 total)
You must be logged in to reply to this topic.
AppsLead › Forums › From Zero to Hero with Nodejs › LED Integration in High-Rise Projects
This topic contains 1 reply, has 2 voices, and was last updated by retage 1 month, 1 week ago.
We recently faced major delays installing integrated LED signage on a high-rise façade. Coordination between electrical, façade, and media vendors broke down at the shop-drawing stage. We underestimated the complexity of structural attachment and maintenance access. How do you plan constructability for façade-integrated LED systems? We’re trying to avoid similar overruns in future projects.
Planning façade integrated LED systems requires early multi trade coordination focused on attachment design, power routing, and long term access, engaging Consulting Services at concept stage allows structural and electrical interfaces to be modeled together, identifying cable paths and maintenance points before shop drawings, using unified BIM environments and staged mockups supports accurate detailing and minimizes delays, this ensures constructability and maintainability without design rework.
You must be logged in to reply to this topic.